
Retail Store Solar Installation




Project Date
31 July 2025
Location
Houston, Texas
System Size
30 kW Solar
Energy Generation
105,000 kWh / Year

Project Information
This large-scale solar installation was developed for a manufacturing facility looking to optimise energy efficiency and reduce operational power expenses. The facility required a reliable renewable energy system capable of supporting high electricity consumption.
Our solar specialists designed a 200 kW system using high-performance solar panels strategically placed across the facility’s rooftop structures. The system was engineered to generate maximum energy output while maintaining consistent performance across different weather conditions.
The project included advanced energy monitoring tools that allow facility managers to track energy production and system performance in real time. By switching to solar energy, the manufacturing facility has significantly reduced its reliance on traditional grid electricity.
Energy Savings Results
Reduced electricity costs by nearly 60% while producing over 40,000 kWh of renewable energy annually.
